KANO11-S3-Powerline Contract
Stringing of 5km Double circuit Aluminum kingbird and installation of 10km OPGW and all associated accessories. Contract amount: USD 306, 699.20 Brief Description of the Works performed: installation of 44,130.84m of Kingbird steel reinforced conductor and 8,055m of OPGW and installation of all Line Accessories Name of Employer: Kansanshi Mining Plc, Zambia Address: SITE OFFICE P.O BOX 110385 SOWEZI, Zambia Completion Date: 15/07/2024
Nov 211 min read


Project Highlight: Supply of Wooden Electricity Poles for ZESCO
In a major infrastructure support initiative, a contract valued at USD 3.6 million was successfully executed for the supply of 22,000 wooden electricity poles. Commissioned by ZESCO, Zambia’s leading power utility, the project aimed to bolster the country’s electrical distribution network. The poles were delivered to ZESCO’s headquarters on Great East Road, Lusaka, contributing to the expansion and reliability of power lines across the region.
Aug 251 min read


Infrastructure Update: Galvanized Steel Wire Installation for CEC Zambia
IOn August 23, 2022, a contract valued at USD 470,000 was successfully completed for the Copperbelt Energy Corporation (CEC), Zambia. The...
Aug 251 min read


Current Project: 66kV Overhead Line Upgrade for Lunsemfwa Hydro Power
An infrastructure upgrade is underway for Lunsemfwa Hydro Power Company Ltd., Zambia, involving the enhancement of two critical transmission lines—Mulungushi Line “B” and Lunsemfwa Line “C.” With a contract value of USD 473,000, the project includes the installation of 180,000 meters of Bear aluminum steel reinforced conductor and 112,000 meters of Wolf aluminum steel reinforced conductor, along with the replacement of all line accessories. The works are being carried out for